Optimization of Recreational Park Development in Klaten District by Using Critical Path Method (CPM)
DOI:
https://doi.org/10.59890/ijebma.v4i2.923Keywords:
Critical Path Method, Manajemen Proyek, Optimasi, CrassingAbstract
Recreation Parks are one of the tourist/visit destinations for people to fill their free time or vacation. The plan to build a recreation park in Klaten Regency is expected to be completed within 70 days. By preparing good project management, it is possible to estimate the time and costs required to carry out the project, so that the project can be completed within the desired time with minimum total costs. The method used to solve this problem is the optimization of the critical path method. The critical path method is a method used to determine the sequence of critical activities or activities that cannot be postponed along with the fastest total time to complete the entire project. The results of the discussion using the Critical Path Method regarding the problem of building a Recreational Park project in Klaten Regency showed that the fastest time to complete the project was 84 days at a cost of Rp. 540,000,000,- and after optimization according to the expected time (70 days), the costs that must be incurred are Rp. 566,750,000
References
Arianie, Ganesstri P., Nia Budi. 2017. Perencanaan Manajemen Proyek dalam Meningkatkan Efisiensi dan Efektifitas Sumber Daya Perusahaan (Studi Kasus : Qiscus Pte Ltd). Jurnal Teknik Industri, 12(3), 189-196.
Iman, Firdaus H., Hadi Wahyono, Eka Bambang G. 2018. Evaluasi Penjadwalan Waktu Pada Proyek Pembangunan Rumah Tipe 30 Di Istana Tegal Besar Kabupaten Jember Dengan Metode CPM. Jurnal Ekonomi Bisnis dan Akuntasi, 5(2), 153-157.
Lokajaya, I Nyoman. 2017. Analisis Pengendalian Wakyu dan Biaya pada Proyek Peningkatan Jalan dengan Metode CPM dan PERT. Jurnal Teknik Industri, 16(2), 104-125.
Perdana, Surya, Arif Rahman. Penerapan Manajemen Proyek dengan Metode CPM (Critical Path Method) pada Proyek Pembangunan SPBE. Jurnal Pengabdian Masyarakat, 3(1), 242-250.
Polii, Rovel Brando. 2017. Sistem Pengendalian Waktu Dengan Critical Path Method (CPM) Pada Proyek Kontruksi. Jurnal Sipil Statik, 5(6), 363-371.
Siang, Jong Jek. 2011. Riset Operasi dalam Pendekatan Algoritmis. Yogyakarta : Andi Publisher.
Sugiharto, Toto, Nifi Triana. 2007. Analisis Jaringan Kerja Untuk Mengukur Efisiensi Waktu dan Biaya Pelaksanaan Proses Produksi : Studi Kasus Pada Perusahaan Mujur Jaya. Jurnal Ekonomi Bisnis, 3(12), 212-219.
Sugiyono. 2017. Metode Penelitian Kuantitatif, Kualitatif, dan R&D. Bandung: Alfabeta.
Siswanto. 2007. Operations Research Jilid 2. Bogor : PT Gelora Aksara Pratama.
Wiratmani, Elfitria , Galih Prawitasari. 2013. Penerapan Metode Jalur Kritis dalam Penyusunan Jadwal Pelaksanaan Proyek Pembangunan Fasilitas Rumah Karyawan. Jurnal Faktor Exacta, 6(3), 210-217.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Fitriana Wulandari

This work is licensed under a Creative Commons Attribution 4.0 International License.